City of Yuma, AZ
We were impressed with Jason, he represented your company very well on the job in Yuma. We’ve had vendors/workers in the past who show up, fumble around and are not totally familiar with their equipment. Not the case with Jason, he was professional, prepared and jumped right in and got started.
Thanks, Craig
Craig Hochheimer
Utility Systems Supervisor
Oakridge National Laboratories – Department of Defense
Oakridge, TN
Optimech, LLC
Many 8”, 10” and 12” Freezes and Linestops on the Kraken & Cray Super computers
Dulles International Airport
Virginia
DMG Consultants / Turner Construction
4 - 8” Simultaneous Freezes for Airport computers
San Diego International Airport
San Diego, CA
Pacific Rim Mechanical
8” Freezes and linestops on the Airport computers
Smithsonian Air & Space Museum
Washington, DC
Calvert Mechanical
14” Freeze on Chilled water
NSA Computer Data Center
Washington, DC
Calvert Jones Co. Inc.
Critical Data Pipe Freezing
National Research Lab
Washington, DC
Critical copper pipe freezing
AT&T Central Computer & Billing Center
San Diego, CA
Contractor: R.J.Duam Const.
Various line stopping, hot tapping and Pipe freezing on Condensate water
Dept of Homeland Security, Immigration & Customs
Los Angeles, CA
D. Burke Mechanical
4 – 16” Simultaneous Freezes on Chilled water
Bank of America Data Center
Brea, CA
Various line stopping and hot tapping on data chilled water
Bank of America Data Center
Louisville, KY
Comstock Brothers
Various line stopping and hot tapping on data chilled water
Fairchild Semiconductor, Inc
Mountain Top, PA
6” Critical Data Freezes Glycol
Pfizer Corporation CB-2
San Diego, CA
Pacific Rim Mechanical
Many 14”, 12” and 8” Critical Freezes and linestop
Children’s National Hospital
Washington DC
Dominion Mechanical
Various Critical Freezes
Department of Justice - Federal Records Data Storage
Complete Building Services
Data Center Pipe Freezing
NIST Computer Data Center
Gaithersburg, MD
Calvert Jones Co. Inc.
Critical Data Pipe Freezing
Washington & Lee University
Lexington, VA
K. Jellstrom & Lee
Heating System Freezes
Tennessee Valley Authority
Raccoon Mountain, TN
Critical System Freezing
Smithsonian Air & Space Museum,
Washington, DC
14” Chilled water
Dept of Homeland Security, Immigration & Customs,
Los Angeles, CA
16” – Simultaneous Chilled water (4) Freezes
Cal Poly
San Luis Obispo, CA
4” – Heating Hot water Freezes
ESS Chill Water Systems
Mexicali, B.C. Mexico
8” – Heating Hot water Freezes
Salt Lake Mormon Tabernacle
Salt Lake City, Utah
Various Freezes – Heating Hot water
National Institute of Standards and Technology - NIST
Washington, DC
Pipe Freezing of main data computer cooling system.
Contractor – Calvert Jones
US - Dept. of Justice - Office of Information
Rockville, MD
PipeFreezing of US information storage computer’s cooling system.
Contractor – Complete Building Services
Campbell Soup Company
Camden, NJ
PipeFreezing of corporate data cooling system.
Contractor – FMA Construction
Hershey Company – Y & S Candies - Swizzler
Lancaster, PA
PipeFreezing of Reactor Effluent system.
Contractor – TAH Construction
Fairchild Semiconductor, Inc
Mountain Top, PA
PipeFreezing of data cooling system.
Performed directly for company
City of Rowland Arkansas
Littlerock, AR
1 – Emergency 42” linestop on industrial water supply
Contractor – Harper Construction, AR
City of Lynchburg, VA
1 – 30” linestop on Sewage Pump-station indoors 5 stories below ground
Contractor – Hydro Tap, VA
Tennessee American Water
Chattanooga, TN
1 – 30” High Pressure linestop on water supply
Contractor – East Tennessee Grading
And many more...
|